Select reference plants

- Sembten biogas plant
3 x 712 kW, rehabilitation, operation
- Malchin biogas plant
5.0 MW, conceptual design, basic design, operation
- Münzenberg biogas plant
537 kW, rehabilitation and repowering, operation
- Havelberg biogas plant
526 kW, project development, design and construction, operation
- Berg biogas plant
526 kW, project development, design and construction, operation
- Ketzin biogas plant
2.5 MW gas fed into grid, design and construction, operation
- Sauen biogas plant
530 kW, project development, design and construction, operation
- Schwanebeck biogas plant
875 kW, rehabilitation and repowering, operation
- Fürstenwalde biogas plant
1.34 MW, waste processing, basic design, operation
- Pilot plant in Fürstenwalde for technical fermentation tests
to top